Header
CFS Home
About CFS
Environment
Clients
Project Portfolio
Recruitment
Contact Us
Services
CAD Office
Joinery
Electrical
Clipsal C-Bus
Finishing
Mezzanine Floors
Shopfitting
Racking & Warehousing
Product Gallery
Latest News
CFS achieve CHAS accreditation
Where's Wallace?
WOW bespoke joinery pieces
Grey_bottom
Header

Title

Please select one of our projects from below to view more details:

KOHLER SHOWROOM - new High St construction
PTS AYLESFORD - new construction & Display and Exhibiton area
BSS NATIONAL TUBE DISTRIBUTION CENTRE - new construction
BSS CARDIFF - branch relocation
PTS SHEFFIELD - branch relocation
BUCK & HICKMAN FELTHAM - branch relocation
FABRICOM AIRPORT SYSTEMS - baggage reclaim construction
SESSIONS SPA - design and re-fit of beauty spa and salon
University of Hull - Lecterns

KOHLER SHOWROOM - new High St construction

Client:       West One Bathrooms
Designer:  Harvey Langston-Jones (www.m-ap.com)
Location:   Clerkenwell Road, London
Area:        460m²/4951ft²

CFS was instructed to strip out the existing retail unit, based over 2 floors and previously used as a coffee shop and bar. In doing so we removed 97 tonnes of rubble! The empty shell was then transformed into a high end bathroom showroom; a partnership between West One Bathrooms Ltd and Kohler Mira Ltd.

In order to recreate the corporate display pods to Kohler’s design, we travelled to Chicago to survey their prototype displays. These were then recreated back in the UK. The completed Clerkenwell Rd showroom features state of the art technology and materials, such as LG Hi Macs Solid Surface and C-Bus Intelligent lighting, and is a project that we are very proud to have completed.